Fabricate and install steel framed building/repairs to boiler house.

Our team of employees successfully pass all of the security checks needed to gain access to the various HM Prisons that we have worked on in the past including HM Prison North Sea Camp in Boston. We fabricated a steel framed building at our workshop before installation on site. We also carried out repairs to the Prison’s boiler house.

Duration:

3 weeks

Client:

Princebuild Ltd

Completed:

August 2020